Friday, November 7, 2008

Group Statement on Responsibilties

I mostly focused on kismet though a lot of this crossed over with matinee. The main aspects that I brought into the map were adding trigger volume and sound for the interpactors; the moving elements such as the railings and the pipes for stepping stones. The sequence for the coloured lighting was similar to the counting lights that I had tested in my own map, getting the lights to count down on/off. The industrial lights going up the lifts used this sequence. The spot light and cone used to make the mist was added by me and the teleporters.

No comments: